PUMA ENERGY - 110 MW THERMAL POWER PLANT

PROJECT BRIEF
On May 24, 2018 the electrical installation and commissioning of the 107 Megawatts combined power cycle plant for Ghana Power Generation Company Limited began. The Plant consisted of 2 gas generators with the excess heat fuelling a boiler for steam production. steam produced is supplied to 2 steam generators for additional power generation. Process and plant automation limited did the plant electrical installation as well as the commissioning.

SCOPE OF WORK

  1. Testing of Electrical panels
  2. Laying of Cable trays
  3. Routing of Cables
  4. Engineering (Cable Callout, Cable Block Diagram)
  5. Instrumentation
  6. Cable Terminations (Low Voltage Cables and Medium Voltage Cables)
  7. Testing and Commissioning