DESIGN, MANUFACTURING SUPPLY & INSTALLATION WORKS FOR GHANA ELECTRICAL PROJECT

PROJECT BRIEF
In June 2017, PPA and YARA met to discuss project implementation plan for their new production facility in Tema. After discussions and design works, PPA received the contract to commence work in February 2018. This Project was aimed at design, manufacturing, supply and Installation works for Ghana Electrical Project for fertilizer Manufacturing Plant -Tema. It included the supply and installation of hardware such as MLV Panels, Automatic Transfer Switches, Power Factor Correction Panel, Earthing works, Transformer and Metering panel as well as supply and installation of Cable trays, Cables, Lights and Emergency System. The entire system was tested, commission and project document including as built drawings was handed over to client.

COCA COLA - DESIGN, SUPPLY & INSTALLATION OF THREE INPUT 4000A SYNCHRONISING PANEL

PROJECT BRIEF
In August 2018, Process and Plant Automation Limited (PPAL) commenced a project (retrofitting of main switch room) for Coca-Cola Ghana. The objective of the project was to upgrade the main switch board (utility panel) consisting of 2 No. utility sources, 3 No. Diesel generators and a bus tie-in capability for a Solar system (future plan) feeding a separate load of 4000 Amps and 2 No 4000A Distribution Board.