COCA COLA - DESIGN, SUPPLY & INSTALLATION OF THREE INPUT 4000A SYNCHRONISING PANEL

PROJECT BRIEF
In August 2018, Process and Plant Automation Limited (PPAL) commenced a project (retrofitting of main switch room) for Coca-Cola Ghana. The objective of the project was to upgrade the main switch board (utility panel) consisting of 2 No. utility sources, 3 No. Diesel generators and a bus tie-in capability for a Solar system (future plan) feeding a separate load of 4000 Amps and 2 No 4000A Distribution Board.