BUILDING MANAGEMENT SYSTEM - THE BANK HOSPITAL

PROJECT BRIEF
The Building Management System (BMS) provides an all-in-one information and control centre for all critical load and equipment in the building. Through the X-Pro software and other interconnecting infrastructure, utilities and equipment such as lights, generators, elevators among others are constantly monitored and controlled where necessary. This helps facility managers and administrators make real-time and informed decisions.

NCA TOWERS - SMART METERING

PROJECT BRIEF
The aim of the smart metering project at the NCA towers was to provide an all inclusive and accurate system for billing tenants and all other users of the building based on their respective energy consumption. This was to alleviate the problem of billing the occupants of the space based on fixed rates.

JUABEN OIL MILLS - PLANT PRODUCTION MASS BALANCE

PROJECT BRIEF
On the 6th of July 2018 Automation Solution Limited (ASL) commenced a project on Energy Metering Solution at Juaben Oil Mills Limited. Measuring fluid use accurately under all load  conditions provides vital information on usage and associated costs that can improve efficiency in four key areas; Plant efficiency, Energy efficiency, Process control, Costing.

WILMAR - INTEGRATION & AUTOMATION OF VYNCKE BOILER

PROJECT BRIEF
In June 2016, Process and Plant Automation was engaged on a project for Ghana Specialty Fats Limited - a Wimar Company for Integration and Automation of Boiler System. The scope of work was to Supply, Design and Install a Motor Control Centre, SCADA Interface System and PLC System Integration. The boilers integrated were the Vyncke 20 tons and Wusi Boiler 10tons. A PLC Motor Controlled Centre was deployed and installed. The boiler system was controlled from SCADA interface from the control room.